top of page

Location    : Central Point, Oregon 

Client        : Central Point School District 6
Type          : Industrial building renovation
Size           : 27248 sqft
Status        : Completed
Year           : 2019

Team         : HMK Co. ( Project Manager), 

                  : Vitus Construction ( Contractor)
                  : Leo Palombo (Makers lab consultant),  
                  : Arcsine Engineering, 
                  : SISUL Engineering, 
                  : CIOTA Engineering

                  : Nittihaus

Photos       : Wes Duval

Located in Central Point, CraterWorks is an alliance between JC6 (Jackson County School District 6) and a local nonprofit D.I.R.T. (Direct Involvement Recreation Teaching). With an adaptive reuse approach, the project aims to reform an existing 20,000 square feet industrial foundry into a creative hub with hybrid classrooms, a professional studio and open markets. 

New programs

Block Zoning_1.jpg

open space
gallery + kitchen + restrooms
entry area
fabrication & design space 01
fabrication & design space 02
fabrication & design space 03

future construction phases

Craterworks MakerSpace by Arkitek:architecture&design is an adaptive reuse project aimed to reform an industrial foundry into a sustainable creative fabrication hub.

south-west 
sun exposure

Craterworks MakerSpace by Arkitek:architecture&design is an adaptive reuse project aimed to reform an industrial foundry into a sustainable creative fabrication hub.
Craterworks MakerSpace by Arkitek:architecture&design
bottom of page